Drone
New: Custom roles for your team

All-in-One Drone Fleet Management Software

Plan jobs, schedule pilots, sync flight logs automatically, and keep the fleet maintained. Then turn drone photos into maps, 3D models, and client reports.

Watch the 1-min tour

Field-Tested by Professional Operators

Legacy Technology LabMobiLysisOAMK - Oulu University of Applied Sciences

Why switch

One platform instead of five

Today

  • Spreadsheetsreplaced byJobs
  • Mapping appreplaced byDrone Mapping
  • Logbookreplaced byFlight Logs
  • Shared drivereplaced byDocuments
  • CRM appreplaced byCRM
All five in DroneBundle
Overview screen in DroneBundle

Overview. Flight hours, jobs, pilots and fleet status for the whole operation at a glance.

Learn more

Drone Mapping

From flight photos to client-ready results.

Maps and 3D models built from the photos already on your job.

A commercial roof in DroneBundle with three findings, a saved roof span, an extension area and a roof junction measurement
Demo imagery: Matthew Guertin · CC BY 4.0
  • MeasureDistances, areas, heights, roof pitch and volumes.
  • Mark findingsPin a spot and its best photos come attached.
  • Thermal mapsReal temperatures from DJI thermal photos.
  • ShareA PDF report or a link your client can open.

On every plan, with processing credits included each month.

DroneBundle report editor with an inspection report preview, findings and measurements from the roof scan
Your findings and measurements, ready for the client report.

Run the job from the field

Check the airspace, see every job, and update status with photos before you leave the site.

Download DroneBundle on the App StoreGet DroneBundle on Google Play

Included with every DroneBundle account

Fleet overview in the DroneBundle iPhone app
Airspace and weather map in the DroneBundle iPhone app
The DroneBundle iPhone app home screen
Job list in the DroneBundle iPhone app
Updating a job status from the field in the DroneBundle iPhone app

How It Works

Plan it. Fly it. Deliver it.

One system from airspace check to final report. Nothing re-entered, nothing missed.

  1. 1. Plan the mission

    Check the airspace and weather window for your site, run the risk assessment, then assign your pilot and aircraft. Every job leaves the ground cleared to fly.

  2. 2. Fly, logs sync themselves

    Your pilot flies the job. The companion app pulls every flight log straight off the aircraft and files it to the right job on its own. No card swapping, no manual entry.

  3. 3. Process, inspect, and deliver

    Turn the job's photos into a map or 3D model. Save measurements, record findings with photo evidence, and send a report or a shareable link. Everything stays on the job, ready for your client.

Land, and your flight logs are already filed.

AI Assistant

Automate the manual work by chatting

Tell the assistant what you need, the way you'd tell a colleague. It looks across your projects, jobs, and pilots, prepares the work, and shows you exactly what it's about to do. You approve, it's done.

Every change is shown to you first. Nothing runs without your approval.

Features

Built for teams running at scale

The capabilities large operators ask for, in one platform, with your data and your brand under your control.

Compliance and safety, built in

  • Risk register
  • Incident reports
  • Scheduled audits
  • Maintenance schedules
Learn more
Compliance and safety, built in

Operations at scale

Thousands of images on a single job, thousands of jobs imported at once. Built for operations that keep growing.

Learn more
Operations at scale

Every flight, fully analyzed

Flight logs sync off the aircraft on their own. Each one breaks down into the full path, speed, altitude, and battery health, with the key moments flagged for you. Replay any flight in 3D.

Learn more
Every flight, fully analyzed

Plus everything else that keeps an operation running.

INTEGRATIONS

Fits Your Existing Workflow

Connect DroneBundle to the tools you already run. Send updates to your other systems automatically, so the same details never get entered twice.

View all integrations
DroneBundle connects to your other tools

Trusted Across Industries

Legacy Technology Lab - Enterprise Roof Inspection at Scale

Challenge

Managing institutional-scale drone inspections across thousands of commercial properties required coordinating pilots, missions, documentation, and compliance far beyond what most drone platforms were designed for.

Result

A scalable operational framework supporting 20,000+ inspections across 1.4 billion square feet of commercial real estate.

MobiLysis - Helsinki Traffic Management

Challenge

Coordinating 6 pilots across 7 locations in challenging weather conditions while maintaining equipment visibility, managing flight schedules, and ensuring data integrity for all flight logs.

Result

200 flight logs uploaded efficiently. 74 hours of flight time managed across multiple sites. Built-in weather forecasting enabled optimal flight scheduling despite difficult conditions.

OAMK - Drone Fleet Management for Research

Challenge

Tracking a growing fleet of drones from multiple manufacturers across various research projects using Excel spreadsheets and manual updates made it difficult to maintain an accurate overview of equipment.

Result

Full visibility into drone fleet with real-time equipment tracking. Significant time savings compared to Excel-based tracking. More time dedicated to research and training activities.

What Professional Operators Say

"DroneBundle fills that gap. It gives organizations like ours the ability to manage missions, documentation, and field operations in a way that actually scales. Just as importantly, their leadership team has been exceptional to work with: responsive, thoughtful, and clearly committed to building something that supports professional operators."
Chris GuarneraCEO, Legacy Technology Lab
"DroneBundle helped us keep the entire operation organized, even with six pilots working across several sites in difficult weather conditions. The in-built weather forecasting and flight planning tools made it easy to schedule flights at the right time, while our pilots could quickly upload their logs for instant review."
Manos BarmpounakisCEO, MobiLysis
"Operational transparency and compliance are critical to everything we do at Legacy. Before any mission is executed, we ensure pilots are properly vetted, airspace risks are mitigated, and insurance requirements are confirmed. DroneBundle gives us the visibility needed to manage that process with confidence."
Alicia VanderWalDirector of Operational Enablement, Legacy Technology Lab
"With DroneBundle, we have full visibility into our drone fleet. We can see which pilot has which equipment, what project it's being used for, and when it's due back. It saves us a lot of time compared to our old Excel-based tracking."
Henry HinkulaResearcher for Digital Solutions, OAMK
"From an operations standpoint, DroneBundle has allowed us to scale our data collection in a much more organized and predictable way. When you're coordinating pilots, assets, and inspections across multiple properties, communication and visibility are everything."
Dustin PendergrassDirector of Operations, Legacy Technology Lab

Security & Compliance

Security you can trust

Built to the standards your clients and their auditors expect, with your data kept private and secure.

Enterprise cloud hosting

Your data runs on resilient, enterprise-grade AWS infrastructure.

AES-256 encryption

Encrypted in transit and at rest, from files to records.

SOC 2-aligned controls

Our practices follow SOC 2 security and access standards.

GDPR

Built for EU data-protection rules, with a clear data commitment.

Role-based access

Everyone on your team sees only the work their role allows.

Full audit trail

Every change is recorded, so you can always see who did what.

Read our GDPR commitment

Frequently Asked Questions

Try DroneBundle Free for 14 Days

No credit card required. Start planning missions, running your jobs, and generating reports immediately.